-
HID Brand Tin Ore Mining Dredger with Water Flow 8000m3/H for Sale
Technical ParametersDescriptionRemarkTotal Length95MWidth17.5MDepth2.8MFlow Capacity2000m3/hWorking Weight1300TTin Ore Handling Capacity700T/HABOUT HID DREDGER:A wide range of use applicationsHigh efficiency, large output, far pump distance, low fuel consumptionFull hydraulic control with Rexroth, V
-
River Aquatic Plant Cleaning Machinery for Floating Plastic Bottle
working capacityCutting width3.1m3.5m3.8mCutting depth1.2m1.2m1.5mCarrying capacity7.5m315m322m3Max. speed6km/h7km/h8km/hWork speed3.5km/h3.5km/h3.5km/hPower60kw75kw90kwEndurance ability24h24h24hType of drivePaddle wheel and PropellerPassenger1-21-21-27. Advantage :1Green and enviromental protection
-
Heavy Duty Siemens PLC Trailing Suction Hopper Dredger for Lake
Trailing suction hopper dredger is self-propelled and non-self propelled . the dredging pump drives the front of the screw rake head to churn .cut collection to the underwater position . and through the suction pipe to get the bottom silt .sand .and other loose material with water then through
-
Cutter Suction Dredger/ Sand Suction Dredger / Dredger Machine with High Efficiency
PLC and hydraulic control systemAdvantages1.Great Adaptability. The cutter suction dredgers can be widely used in river, lake, sea, reservoir and so on for sand/mud dredging,waterwaycleaning and reclamation work.2.High Efficiency. The cutter suction dredgers can dredge and discharge sand/mud at the
-
Customized 6-26 Inch Cutter Head Suction Dredgers for Sand Clay Dredging in River Lake ...
Basic Info. Model NO. RLCSD450
-
2000m3/Hour Cutter Suction Dredger/Dredging Ship/Dredging Vessel
ModelSand and solid capacityMax. dredging depthDischarge distanceHJ 200160m3/h8m800mHJ 250200 m3/h9m1000mHJ 300300 m3/h10m1200mHJ 350400 m3/h11m1500mHJ 400500 m3/h13m1500mHJ 450600 m3/h14m1500mHJ 500800 m3/h15m2000mHJ 550900 m3/h16m2000mHJ 6001100m3/h16m2000mHJ 6501200 m3/h16m2100mHJ 7001400 m3/h17m
-
ISO/BV/Ce Inspected River Sand Cutter Suction Dredger for Sale
PLC and hydraulic control systemPhoto Gallery:Workflow Chart:Our Certificate:Delivery:The dredger will be dismounted and transported by container and then installed in the construction site. Also the time of delivery will be guaranteed according to the contract.Welcome to Julong!