Mining Machinery

Manual and Electric DTH Drilling Hammer Disassembling Breakout Bench

Xiamen Sansung Mining Equipment Co., Ltd.
  • Certification:ISO 9001:2000
  • Standard:GB, GOST
  • Surface Treatment:Spray-Paint
  • Manufacturing Process:Forging
  • Material:Alloy Steel
  • Condition:100% New

Base Info

  • Model NO.:ECX10, CX5, CX8
  • Delivery:25-30days
  • MOQ:1PCS
  • Color:on Request
  • After Sale Service:Yes
  • OEM/ODM:Yes
  • Transport Package:Plywood Box
  • Specification:3" to 10"
  • Trademark:SANSUNG
  • Origin:China
  • HS Code:73269010
  • Production Capacity:5000sets,Year

Description

ModelCX-5(manual)CX-8(manual)ECX10(electric)Operate  hammers3-5"6-8"3.5-10" (Sandvik)Length920mm1100mm1060mmWidth510mm620mm1050mmHeight875mm875mm930mmWeight200kg230kg800kg

Note: the standardmotor request power source with 3phase,380V,50Hz. We can adjust the motor ascustomers' request.

More Specifications of the Electric DTH Hammer Breakout Bench ECX10:

weight800kgMax.locking  torque force67KN*m(50ftlb)Max.dismounting  torque force81KN*m(60ftlb)operating  height800mmHydraulic  pressure0-20MpaPower3kwThe chain  rotation speed10RPMPiston speed1.8RPM

 

Manual Breakout Bench Operation

1.Put hammer on the bench

2.Adjust the position of hammer and wrench; use wrench to block the top sub side of hammer; let wrench and jack in the same face.

3.Fix K-shaped base with nut.

4.Fix wrench with nuts.

5.Shake handle of Jack slowly till top sub away from hammer.

6.After top sub dismantled, grease the jack, release nuts, discharge the K-shaped base and turn around the Hammer.

7.Adjust the position of hammer and wrench; use wrench to block the drive chuck of hammer; let wrench and jack in the same face.

8.Fix hammer.

9.Fix K-shaped base and the wrench with nut.

10.Shake handle of Jack slowly till dive chuck away from hammer.

 

Electric Breakout Bench Operation

1.Put the hammer on the breakout bench.

2.Drive the handle switch of unloading oil cylinder, adjust the cylinder to proper height.

3.Adjust left lock chains to lock the top sub then fasten the active pin.

4.Adjust right lock chains to lock top sub side of the external cylinder of hammer then fasten the active pin.

5.Push handle switch of both the right and left lock chains, break out the top sub of hammer slowly.

6.After finishing break out, make the oil cylinder return oil, take out the active pins and loosen the left and right chains, turn the hammer around.

7.Drive the handle switch of unloading oil cylinder, adjust the cylinder to proper height.

8.Adjust left lock chaind to lock the drive chuck then fasten the active pin.

9.Adjust right lock chains to lock the chuck side of external cylinder of hammer then fasten the active pin.

10.Push handle switch of bith the right and left lock chains, break our the drive chuck of hammer slowly.

Manual and Electric DTH Drilling Hammer Disassembling Breakout BenchManual and Electric DTH Drilling Hammer Disassembling Breakout BenchManual and Electric DTH Drilling Hammer Disassembling Breakout Bench