Sandvik/Atlas 3-10 Inch Eccentric Overburden Drilling Casing System
Xiamen Sansung Mining Equipment Co., Ltd.- Certification:ISO 9001:2000
- Standard:GB, GOST
- Surface Treatment:Spray-Paint
- Manufacturing Process:Casting
- Material:Alloy Steel
- Reamed Diameter:118-378mm
Base Info
- Model NO.:ODEX90,115,140,165,190
- Hammer Model:Ql30, DHD340, DHD350, Ql60, Ql80. SD10
- Condition:100% New
- Delivery:20-30days
- MOQ:1PCS
- Color:on Request
- After Sale Service:Yes
- OEM/ODM:Yes
- Transport Package:Carton
- Specification:108-325mm
- Trademark:SANSUNG
- Origin:China
- HS Code:82071300
- Production Capacity:30000 PCS,Year
Description
Type
Casing Tube
OD(mm)
Casing Tube
ID(mm)
Casing wall
thickness(mm)
Guide Device
max size(mm)
Reamed
Dia (mm)
Casing shoe
mini Dia(mm)
Pilot bit D (mm)
Hammer type
ODEX85
108
94
7
92
117
86
85
COP34/DHD3.5
ODEX90
114
101
6.5
99
125
92
90
COP34/DHD3.5
ODEX98
127
109
9
107
138
100
98
COP34/DHD3.5
ODEX115
146
126
10
123.5
155
117
115
COP44/DHD340/SD4/QL40
ODEX140
168
148
10
146
180
138
136
COP54/DHD350/SD5/QL50
ODEX145
178
158
10
156
192
147
145
COP54/DHD350/SD5/QL50
ODEX152
183
163
10
161
196
153
151
COP54/DHD350/SD5/QL50
COP64/DHD360/SD6/QL60
ODEX165
194
174
10
172
206
162
160
COP64/DHD360/SD6/QL60
ODEX190
219
199
10
196
234
187
185
COP64/DHD360/SD6/QL60
ODEX208
245
225
10
222
263
210
208
COP84/DHD380/SD8/QL80
ODEX240
273
253
10
251
305
241
240
COP84/DHD380/SD8/QL80
ODEX280
325
300
12.5
298
350
282
280
DHD112/DHD380
ODEX/Eccentric equipment enables you to drill and case deep holes simultaneouslyin all types of formation, even those with large boulders.
The method is based on a pilot bit and eccentric reamer, which together drill a hole slightly larger than the external diameter of the casing tube. This enables the casing tube to follow the drill bit down the hole.
When using ODEX, part of the impact energy is diverted to the casing tube via a shoulder on the guide device, which in turn impacts a special casing shoe at the lower end of the casing.
Quality warranty:
Our products are made of high quality steel and all spares parts are inspected strictly before shipping.
Production time:
within 15-25 days after receiving the advance payment or full payment
Transportation:
according to your requests.
Package:
The material of packing is ply-wooden cases and pallet to avoid the damagement in transportation.