Retrievable Drilling Tools Overburden Eccentric Casing System
WUHAN KINGDRILLING DIAMOND CO., LTD.- Certification:ISO 9001:2000, SGS
- Standard:GB
- Surface Treatment:Spray-Paint
- Manufacturing Process:Forging
- Material:Carbon Steel
- Transport Package:Wooden Case
Base Info
- Model NO.:MK3E114,3"
- Trademark:MING
- Origin:China
- HS Code:8207199000
- Production Capacity:20000PCS,Year
Description
Technical Parameters
Model
Reaming Diameter(mm)
Casing Diameter(mm)
Equipped Hammer
MK3E108
118
93-99
90
MK3E127
136
115-117
110
MK3E146
152
130-134
110/340
MK3E168
185
148-156
110/340
MK3E178
195
158-166
150/340
MK3E183
196
168-176
350/360
MK3E193
206
176-182
360
MK3E219
236
199-207
360
How to order:
Casing Tube OD & ID + Reamer Bit Diameter + Minimal Casing Shoe ID + Hammer Shank Style
What we can do for you:
- High quality: We are the partners with a lot of big factories in China. We can provide the best quality products to you.
- Competitive price: Competitive price because of direct factory price.
- Fast delivery time:usually it takes 20 days for production.only 3 or 5 days if we have stock of your request size.
- Best quality control:We have our own experienced QC team,there will be strict inspection and testing for each order before shipping out.
- Problems solve ability:This ability comes from rich experiences of drill bits industry and reliable sales..
- OEM,ODM service:your own request about product will be served well.
- Best after service:We will go to your place to check and solve the problems if you need.
Advantages
1.High quality steels materials. Steel is from TIMKEN and Tungsten carbide are YK05, or T6 from Element Six in Germany
2.Kingdrilling DTH tools are forged by advanced electron-hydraulic forging hammer.
3.Advanced heat-treatment equipment: multipurpose furnace heat treatment.
4.Completed moulding (tooling ) departments with many molds available.
5.Professional R&D team,completed quality system.
Strict Quality-Check Systems.
The information you may like to know before order:
1. Methods of Payment:
T/T (Telegraphic Transfer) or Western Union or L/C at sight
2. Handling time for an order
Based on order quantity, normally it takes 25 days for production.
Only 3 or 5 days if we have stock on your request size.
3. Shipping way
Sample order: We suggest Courier express like DHL/UPS/TNT/FEDEX or by air
Bulk order: We suggest by air or by sea.
4. Quality Control
We have our own experienced QC.
There will be strict inspection and testing for each order before shipping out.
5. After Services:
1. Our sales team will response for your question within 24 hours (Holidays Excluded)
2. Technical Support will be available in any time
FAQ:
1. How to order the products?
A: Please send the inquiry with detail item description or with Model number.
2. How about the common packing?
A: If there is no special packing demand, we will take it as our normal packing. First in small carton, and then put in the bigger carton together to make sure goods completed.
3. Can I expect a quality products?
A: Yes. mature production technology ensuring the quality satisfy international request.
4. How to check the product are the exact one you want?
A: If possible, please attach one reference picture to avoid any misunderstanding or any links from our website for a better understanding.
5. How to control quality?
A: We have our own experienced QC team,there will be strict inspection and testing for each order before shipping out.
6. Fast delivery time:
A: Usually it takes 25 days for production.only 3 or 5 days if we have stock of your request size.
7. Shipping way:
A: Sample order: we suggest Courier express delivery such as DHL/UPS/TNT/FEDEX or by air
Bulk order: by air or by sea we suggest.
8. Competitive price:
A:KINGDRILLING factory can supply you the lowest price due to direct sale to customers without distributor!
Product Application:
Transport:
Package and Delivery:
Packed by Carton or Wooden cases.
Delivery:
- Goods in stock can be delivered within 5 days.
- DTH Bits production time is about 15 days.
- DTH Hammer product time is about 30 days.