Professional Rock Crusher Machine Quarry Fine Stone Crushing Equipment Hammer Mill Gold ...
Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd.- Type:Hammer Crusher
- Motor Type:AC Motor
- Motor Power:37kw
- Application:Mine
- Materials:Limestone
- Outlet Size:18-48mm
Base Info
- Model NO.:PC600*600
- Inlet Size:600*600mm
- Condition:New
- Product Name:Hammer Mill Gold Crusher
- Capacity:12-18 T,H
- Main Products:Mineral Processing Plant
- MOQ:1 Set
- Power:37 Kw
- Weight:2100 Kg
- Color:as Your Request
- Certification:ISO, CE, etc
- Advantages:Professional Manufacturer
- Transport Package:FCL or LCL
- Specification:1315*840*1501 mm
- Trademark:Hengchang
- Origin:Jiangxi, China
- HS Code:8474209000
- Production Capacity:100sets,Month
Description
Product Description
Detailed Photos
Product Parameters
Successfully Case
Packaging & Shipping
Company Profile
Certifications
FAQ
1. How long has Hengchang been in business?
Our business has been in operation since 1995. For over 20 years we have served the mining industry offering gold/coltan/tin/tungsten mining equipment
2. How long is the warranty period?
The warranty for the main machine is 12 month, we also supply spare parts to customer.
3. What is the Salary of engineer?
100-120 USD per day, the air ticket, accommodation, should be beared by customer.
4. Where is Hengchang factory located?
how about the transportation? The factory is located in Ganzhou city. The Airport is
Huangjin Airport, which can directly flight to Guangzhou, Shanghai, Shenzhen, Beijing.
5. What is the leading time?
For shaking table and laboratory mining equipment ,we can send out within 10 days;
For large mining equipment and customized machine, the lead time is 30-40 days.
6. What is the nearest Sea port?
Xiamen Port, Guangzhou Port, Shenzhen Port
7. What is the trade terms?
CIF,FOB ect is acceptable.
8. What normal mining procedures including?
A. Sampling and analysis of the sample. take enough sample from different location and depth, analysis the size distribution and
element.
B. Engineer and geologist site survey. based on the analysis report at stage one, the geologist will determine the reserve and mining area. the engineer will consider the plant location and process flow.
C. Separation test. take samples to do separation test based on the process flow on stage Two.
D. Based on the result of testing, adjust the process flow if necessary.
E. Determine the capacity of the plant based on the quotation of plant and estimated output.
F. Place order and equipment production.
G. Plant design. ground clearance and basement building according to the design.
H. Plant installation and testing production.
I. Training and debugging.
9. What information should customers give to us?
In order to let we provide you with efficient & suitable quotation and assistance.
1). What type is the mining? Is it rock stone? or it is sand?
2). If rock stone,What is the general particle size(mm) of the raw ore?
3). What is the handling capacity(tons per hour) you plan to work with?
4).What is the elements of the raw ore? How much percent of each minerals?