Mining Machinery

Numa100 Down The Hole DTH Rock Drill Bit

Changsha Sollroc Engineering Equipments Co., Ltd.
  • Sizes:10 Inch to 30 Inch
  • Color:Black, Gold, Red, Grey, Blue,etc
  • Aplication:Down The Hole Drilling. Mining, Quarry
  • Bit Face:Flat, Convex, Concave
  • Transport Package:Cartons + Ply-Wooden Cases for Exporting
  • Specification:Grade A

Base Info

  • Model NO.:Numa100
  • Trademark:sollroc
  • Origin:Changsha, Hunan
  • HS Code:82071300
  • Production Capacity:10000 Per Month

Description

             NUMA100
 25410"312×φ1820×φ1690.0Numa100-25430512"412×φ1836×φ18102.0Numa100-30531112 1/4"412×φ1836×φ16104.0Numa100-31131812 1/2"412×φ1838×φ16106.0Numa100-31833013"414×φ1842×φ16112.0Numa100-330   


Shank can be available:

1), Dia. 64mm-70mm shank Bulroc BR1
2), Dia. 70mm-95mm shank Halco MACH20, Bulroc BR2
3), Dia. 90mm-102mm shank COP32, COP34, Halco MACH303, M30, DHD3.5, Bulroc BR3
4), Dia. 105mm-152mm shank COP44, DHD340, Halco MACH44, SD4, M40, QL40, Bulroc BR4
5), Dia. 135mm-165mm shank COP54, DHD350R, COP54, Halco MACH50, SD5, M50, QL50, Bulroc BR5
6), Dia. 152mm-254mm shank COP64, DHD360, SD6, M60, QL60, Bulroc BR6
7), Dia. 203mm-330mm shank COP84, DHD380, SD8, QL80
8), Dia. 254mm-380mm shank SD10, Numa100
9), Dia. 305mm-508mm shank DHD1120, SD12, N120, N125
10), Dia. 405mm-864mm shank SD15, SD18
11), VKP80, VKP95, CIR90, CIR100, CIR110, CIR150, CIR200...





We can also provide related products DTH hammers, ODEX system, symmetrix systems, slide block drilling systems, etc and DTH drilling pipes for various thread API REG, API IF, BECO, etc


Product photos


Numa100 Down The Hole DTH Rock Drill Bit


Quality warranty:

Our products are made of high quality steel and all spares parts are inspected strictly before shipping. We have quickly responses for your complaint and suggestion.


Package:
Using ply-wooden cases and pallet for package to protect the products and avoid the damagement during transportation. Also we can customize package according to your special requests.




Production time:

Generally need 15-25 days


Transportation:
By air, By Express or By sea according to your requests.