Mining Machinery

High Efficiency China Stone Grinder Machine Gold Mining Equipment Gold Processing Grinding ...

Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd.
  • Type:Ball Mill
  • Motor Type:AC Motor
  • Motor Power:475kw
  • Rotationl Speed:21.7 R,Min
  • Application:Mine
  • Materials:All Kinds of Minerals

Base Info

  • Model NO.:GM2745
  • Condition:New
  • Product Name:Ball Mill Gold
  • Usage:Grinding All Kinds of Minerals
  • Model:GM2745
  • Capacity:17.5-135 T,H
  • Power:475 Kw
  • Liners Materials:High Manganese Steel
  • Feeding Size:25mm
  • Loading Steel Balls:40 Tons
  • Ball Mill Weight:90420 Kg
  • Transport Package:by FCL
  • Specification:11175*5610*4500 mm
  • Trademark:Jiangxi Hengchang
  • Origin:China
  • HS Code:8474202000
  • Production Capacity:20 Sets,Month

Description

Weight
(kg)
GM071875018000.8200.4-1.17.54043×1450×12004350GM091290012001.1200.3-0.9113843×1850×14004210GM091890018001.5200.5-1.3154443×1850×14006078GM092190021001.8200.6-1.518.54743×1850×14006660GM093090030002.7200.9-2.3225943×1850×14007770GM1224120024004251.6-4.1305540×2300×185010020GM1230120030005.3252.2-5.5376340×2300×185011230GM1245120045007.3253.0-7.5557540×2300×185013210GM1524150024007252.8-6.5556830×2930×206015430GM1530150030009253.5-8.0757430×2930×206016843GM15451500450013.5255.5-13.5908930×2930×206020000GM15571500570017257-15.511010130×2930×206023597GM18301830300013253.0-17.01309525×3960×225029490GM18451830450019255.2-26.015510925×3960×225034210GM18641830640027258.0-40.021012925×3960×225042440GM21302100300020254.0-30.01808475×4060×340041965GM21452100450025255.6-42.02809975×4060×340049230GM24302400300026.5256.5-822809225×5005×397063684GM24452400450032.5258-10038010570×5005×397072284GM273027003000342515-11542010575×5610×450088400GM274527004500402517.5-13547511175×5610×450090420GM323032003000442550-9050011000×7200×5700124000GM3245320045006525100-14563013000×7200×5700145000
5.Ball Mill Applications:
Ball mill is mainly used to grind materials in mineral, cement, refractory, chemical industry, etc. Ball mill has dry and wet ways. When wet ball mill works, certain water and other liquid will be added into materials to increase flow ability of materials, so the capacity is increased. When dry ball mill works, capacity is affected because material flow ability is reduced, so absorbing wind device is needed on the outlet of ball mill, and then negative pressure is formed in the ball mill to increase flow ability of material, so the capacity is increased etc.

6.Sucessful Case:
High Efficiency China Stone Grinder Machine Gold Mining Equipment Gold Processing Grinding Ball Mill

7.Packing & Delivery:
High Efficiency China Stone Grinder Machine Gold Mining Equipment Gold Processing Grinding Ball Mill

8.About Jiangxi Hengchang:
Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd.  is located in No.3 Chuangye Road, Guzhang Industrial Park, Shicheng County, Ganzhou City, Jiangxi Province, China.

Our company is engaged in the mineral processing equipment research, development, design and production for many years history, has accumulated rich experience in design and production. Enterprise in mineral processing equipment industry has had a positive effect, set up the good reputation. And mainly the manufacture of the products like as Shaking table, Flotation equipment, Crushing equipment, Magnetic separator, Screening equipment, Classifying equipment, Agitation tank, Feeding equipment, Gravity separation equipment, Wet separation equipment, Spiral chute, Saw-tooth wave jig and Diaphragm Jig, Grinding equipment, Ball mill, Slurry pump, Centrifugal pump, Conveying equipment.

We manufacture various types of mineral processing machinery and equipment according to our customers' requirements. Our products are widely used for sorting gold, silver, copper, iron, tungsten, lead, zinc, tin, molybdenum, nickel, tantalum, niobium, manganese ore, coal, monazite, rutile, diamonds, other precious metals and precious metals mine, and for the flotation colored, black metal, precious metals and other minerals. And we have export qualifications, our products sell well all over the world for several years, especially exported to Brazil, India, Indonesia,South Africa, Somalia, Philippines, Malaysia, Sudan, Nigeria, Iran, Russia, Ghana, Kazakhstan, Kyrgyzstan, Cambodia, Vietnam, Korea, Mongolia, Myanmar and other countries.
High Efficiency China Stone Grinder Machine Gold Mining Equipment Gold Processing Grinding Ball Mill
High Efficiency China Stone Grinder Machine Gold Mining Equipment Gold Processing Grinding Ball Mill
High Efficiency China Stone Grinder Machine Gold Mining Equipment Gold Processing Grinding Ball Mill

FAQ
1. How long has Hengchang been in business?
Our business has been in operation since 1995. For over 20 years we have served the mining industry offering gold/coltan/tin/tungsten mining equipment

2. How long is the warranty period ?
The warranty for the main machine is 12 month. we also supply spare parts to customer.

3. What is the Salary of engineer ?
100 USD Per day, the air ticket, accommodation, should be beared by customer.

4. Where is Hengchang factory located ?
how about the transportation ? The factory is located in Ganzhou city. The Airport is
Huangjin Airport, which can directly flight to Guangzhou, Shanghai, Shenzhen, Beijing.

5. What is the leading time ?
For shaking table and laboratory mining equipment ,we can send out within 10 days;
For large mining equipment and customized machine, the lead time is 30-40 days.

6. What is the nearest Sea port ?
Xiamen Port, Guangzhou Port, Shenzhen Port

7. What is the trade terms ?
CIF,FOB ect is acceptable.

8. What normal mining procedures including?
A. Sampling and analysis of the sample. take enough sample from different location and depth, analysis the size distribution and
element.
B. Engineer and geologist site survey. based on the analysis report at stage one, the geologist will determine the reserve and mining area. the engineer will consider the plant location and process flow.
C. Separation test. take samples to do separation test based on the process flow on stage Two.
D. Based on the result of testing, adjust the process flow if necessary.
E. Determine the capacity of the plant based on the quotation of plant and estimated output.
F. Place order and equipment production.
G. Plant design. ground clearance and basement building according to the design.
H. Plant installation and testing production.
I. Training and debugging.

9. What Information should customers give to us ?
In order to let we provide you with efficient & suitable quotation and assistance.

1). What type is the mining? Is it rock stone? or it is sand?
2). If rock stone,What is the general particle size(mm) of the raw ore?
3). What is the handling capacity(tons per hour) you plan to work with?
4).What is the elements of the raw ore? How much percent of each minerals?